Post-Accreditation Procedures for Healthcare Facilities in Collaboration with LPAPKP

After obtaining accreditation status, Health Care Facilities (Fasyankes) are required to carry out post-accreditation activities through the System Maintenance and Improvement Program (PPS). The following is the workflow for these activities, which are carried out systematically in collaboration with the Health Office, the Ministry of Health, and the Accreditation Body (LPA):

#1 Healthcare Facilities
  • Prepare the PPS document within a maximum of 1 month after accreditation.

  • Conduct the PPS during the 0–5-year period corresponding to the accreditation’s validity period.

  • Implementation of PPS Using the DFO System

  • To serve as the primary document for post-accreditation implementation.

  • Managed and monitored on a regular basis.

Conduct an evaluation of the implementation of the PPS as reported by health facilities.

Conduct monitoring every three months of the implementation of the PPS in their area.

To provide national guidance and oversight regarding the accreditation and implementation of the PPS.